Thursday, June 26, 2014

Construction Technology 3 [QSB 2514]

Construction Technology 3

 Lecturer: Mr Chiew Seng Khoon

In this module we had learnt industrialized building system( formwork system, precast installation), retaining wall, process of dewatering for basement excavation, curtain wall, prestressing, green building construction, tension membrane roof and steel roof trusses.

The objectives of this module are:
1. To compile the processes involved at preconstruction stage in addition to the principles and controls applied throughout the construction programme.
2. To indentify the methods of heavy/highway and building construction and features information on new construction technology.
3. To introduce the latest construction practices and processes for tall buildings from foundation to roof.

The learning outcomes of this subject are:
1. Illustrate most aspects of elementary construction with an insight into the techniques applied in large- scale development using standard steel sections and reinforced concrete.
2. Apply the methods, materials, equipment and systems used for the construction of tall buildings.
3. Apply industrial methods which are mainly composed of factory produced components to a module or standard increment.

Throughout the whole semester, we had given two assignment. One is given report and me and my group members had chosen dewatering process for our group assignment. Another assignment is individual assignment which we required to draw 20 drawings. Besides that, we had given a mid-term test on week 7 and i quite satisfied for my result therefore i hope i can get good grade for my final exam. Lastly i would like to thank Mr Chiew for teaching us CT3 throughout semester 3 

No comments:

Post a Comment